Our Process

We Are dynamic. versatile. confident.

Haaks Quantity Surveyors is a quantity surveying practice offering traditional quantity surveying and cost engineering services with a diverse hands on approach aimed at exceeding the dynamic needs of the market.

Our service offering includes the commercial property, mining, building and civil sector. The proficiencies of our team have ensured the success of many projects across our current African foot print. Commercial diversity and dynamic project solutions are our biggest success factors. Our Quantity Surveyors offer services from initiation phase right through to close out of projects. We also have extensive experience with TM3 Mining contracts for various mining houses.

Our Work



Police Station Ennerdale
Client: SAPS
Date: March 2022 - Current
Project: Construction of a new Police Station with a total of seven blocks consisting of the CSC building, lecture room, detective building, visible policing building, admin building, stores, and the cell block.
Seriti Coal (Pty) Ltd South Africa
Date: 2020 - 2025
Projects:
  • Destoning
  • Kriel - Blok F Phase 2
  • Kriel - Demolishing
  • Kriel - Feasibility Study
  • Kriel - HME Audit
  • Kriel - MBR
  • Kriel - Pit 4
  • Kriel - Roof Refurbishment
  • Kriel - Sheeting
  • New Denmark
  • New Vaal - LifeEx Project
  • New Vaal - Stockyard Dam
  • North Incline
  • Project Controls
  • Proxa and NuWater Treatment Plant
New Largo Coal (Pty) Ltd South Africa
Date: 2020 - 2023
Projects:
  • New Largo Coal - Pit D
  • Phase 0 - BFS Study
  • Pit F CS - Infrastructure Capex
HARVEST PLACE MALL Glen Marias, Kempton Park
Client: Harvest Place Shopping Centre (Pty) Ltd
Date: November 2019 – July 2022
Project: Construction of +/-18 000m² GLA Shopping Centre, consiting of a Basement, Groundfloor and 1st Floor.
ROYCE HEIGHTS - PHASE 1 Barlett Ext 89
Client: Gonrinha Construction (Pty) Ltd
Date: March 2021 - July 2021
Project: Phase 1 - Construction of a gatehouse, a clubhouse and 84 Residential Units consisting of – 4 floors per block, 3 blocks in total. Block 2 & 3 consisting of a basement and a lift installation connecting block 2 & 3. All common areas to be included in the construction with covered parking bays etc.
SMD - BOKSBURG RELOCATION PROJECT Boksburg
Client: SMD (Pty) Ltd
Date: July 2020 - December 2020
Project: Construction of offices and external infrastructure services – consist of dismantling and re-erection of a +-2000m² structural steel portal frame including new converted container units approximately 310m² in size. Infrastructure development consisting of reinstatement of roadworks, parking, sewage and site wide electrical works.
VAN WYK VILLA San Lameer
Client: Jan van Wyk
Date: July 2020 - December 2020
Project: Construction of +/- 470m² house consisting of 2 storeys and a open deck area with a pool
FIFTH ON BROOKLYN Menlopark, Pretoria
Client: Camdebo Engineering Projects (Pty) Ltd
Date: March 2019 - January 2020
Project: Construction of 30 units, consisting of ground floor, first floor and second floor with 3 different types of units, Type A, B and C.
AHS - PAVILION Pretoria
Client: Afrikaans Hoër Seunskool
Date: 2019
Project: Construction of the embankment and seating area of the pavilion including paving and installation of handrailing
HEINRICH PLAZA Nkana West Kitwe - Zambia
Client: Heinrich Hotels Limited
Date: October 2019
Project: Construction of a 5 959,61m² Shopping Plaza consisting of 8 shops, paved driveway, delivery yard and a food court
O'TWO DEVELOPMENT PHASE 1 Mouille Point, Cape Town
Client: San Antonio Property Investments (Pty) Ltd
Date: January 2018 - December 2019
Project: Construction of 6 storey 18 residential units consisting of 2 lower level basements and 1 retail floor with a swimming pool on the roof
BIPS Maroeladal, Johannesburg, South Africa
Client: Gateway Capital
Date: Phase 1: 2016 - 2019
Phase 2: 2020
Project: Phase 1: British International Preparatory School project, which started in May 2017 and was completed in February 2019, the additional scope of works landscaping, play area, borehole, fencing, carports, pump house, swimming pool, Refuse Yard, Standby Generator was completed June 2019. Phase 2: Estimate for the new pavilion with surrounding paving, stormwater channel, new Hall with existing, 262m retaining wall. Renovation on Excising Parking area
SYDNEY VIEW PHASE 1 & 2 Jansen Park Ext 41
Client: Gonrinha Construction (Pty) Ltd
Date: February 2018 - May 2019
Project: Phase 1 - Construction of 72 Residential Units consisting of – 4 floors per block, 3 Units per floor type A ,B and C. 9 blocks total for phase 2.
All common areas to be included in the construction with covered parking bays etc.
Phase 2 - Construction of 108 Residential Units consisting of – 4 floors per block, 3 Units per floor type A ,B and C. 9 blocks total for phase 2.
All common areas to be included in the construction with covered parking bays etc.
AVBOB SOWETO - NEW HEAD OFFICE Jabulani 2192, Soweto, Johannesburg
Client: AVBOB
Date: 2018
Project: Existing structure fully renovated to fit the purpose of the Client
GLENCORE LEACH VAT Bethanie, North West
Client: Rhovan Mine a Glencore Managed Operation
Date: 2017 - 2020
Project: Construction of new Leach Vat dams. Design and supply of a New Leach Vat consisting of the following packages: Two (2) civil, Three (3) structural steel, and one (1) stainless steel package enrolled to upgrade the original 3 bay Leach VAT system, into a four-bay system allowing a spare bay during any maintenance shutdowns and also alternating ensuring longevity. New Conveyors to move the material from the Leach VAT dams to the Calcine pads.
MAPLE WOOD Pomona, Kempton Park
Client: Vardophase (Pty) Ltd
Date: March 2017 - June 2018
Project: Construction of 36 Residential Units located at Pomona ranging from two to three-bedroom entry level residential development
MAPLE RIDGE Pomona, Kempton Park
Client: Pazospan (Pty) Ltd
Date: July 2018 - October 2019
Project: Construction of 40 Residential Units located at Pomona ranging from two to three-bedroom entry level residential development
ONE HYDE PARK PHASE 1 & 2 Hyde Park, Johannesburg
Client: Sector Five Trading 112 (Pty) Ltd
Date: December 2015 - September 2017
Project: High End Residential Development located in Hyde Park, the first two Phases consist of the construction of two basements with 5 High riser’s apartment buildings - 88 High End Residential Investment properties will a fully equipped gym secured basement Parking’s and local restaurant area.
NKANA SHOPPING MALL Kitwe Zambia
Client: Akrasi Properties Ltd
Date: 2017 - 2018
Project: 22 000m² Mall construction in Kitwe Zambia
HANDY MAN'S LIME PLANT Ndola Zambia
Client: ThyssenKrupp Industrial Solutions (Pty) Ltd
Date: December 2015
Project: Re-measure of work and compiling of a report to compare to the original enquiry document with which the electrical contractor was appointed.